“The permit was filed before demo, and the rough-in inspection was called before I had to ask. I had one phone number for the whole mechanical scope.”
Tenant-improvement HVAC · Lakewood and Pierce County
Permit first. Balance report last.
We install and balance the heating, cooling and ventilation in office suites, clinics and small retail build-outs, on the schedule your contractor already runs.

How a build-out runs
Six steps, in the order the inspector expects
The same order on every suite, so your contractor can set dates around it.
- 01With the drawings
Step 1: Walk the suite
We walk the space with the plans and the lease exhibit, check what the existing units can carry and write a scope your contractor can price around.
You send plans, or the landlord's exhibit
We send the scope and our assumptions in writing
- 02Before demo
Step 2: Permit
We prepare the mechanical drawings and file with the city or county, so the inspector is on the calendar before the ceiling opens.
Permit fees are their own line in our bid
Landlord roof rules checked before we file
- 03Above the grid
Step 3: Rough-in
Ductwork, hangers, boxes, refrigerant lines and condensate drains go in above the ceiling. We call the rough-in inspection before anything is closed.
The ceiling stays open until the inspection passes
- 04At ceiling close
Step 4: Trim and controls
Diffusers, grilles and thermostats go in as the grid closes. Controls are wired to the sequence on the drawings.
- 05Before turnover
Step 5: Start-up
Equipment starts and each sequence is run: heating, cooling, ventilation, shutoff. A failure gets fixed here, not at move-in.
Functional test written up the way the energy code lists it
- 06At turnover
Step 6: Test and balance
Airflow is measured at every diffuser against the design, then adjusted. You get the report for your closeout binder.
Final inspection is called after the report is done
What we build
Four kinds of work, all inside commercial space
Each has its own page with what drives the scope and what a visit looks like.

Rooftop units and splits
Packaged units and mini-splits for offices, clinics and small retail.
Rooftop units
Named, not implied
The state records behind the work
Washington keeps public records for each of these. The footer has the numbers, and the lookup is one click.
Contractor registration
Specialty contractor registrationVerify
WA Registration 000000 · Washington State Department of Labor & Industries
Lets a firm bid and do construction work in Washington. The lookup shows the bond and insurance on file.
Electrical and wiring
Electrical contractorVerify
WA Lic. 000000 · Washington State Department of Labor & Industries
Covers the power wiring that comes with the equipment we install.
06A HVAC/refrigeration specialty electricianVerify
WA Certificate 000000 · Washington State Department of Labor & Industries
Held by the crew members who connect equipment. Ask for their names.
Insurance
Commercial general liability
Your insurance carrier · Policy 000000
Certificate of insurance sent to your contractor or property manager on request.
Refrigerant
EPA Section 608
Held by our technicians who handle refrigerant
Who runs your suite
The person who walks your space signs the bid
Zakiya Talley started the firm to do tenant work the way a superintendent wants it: one point of contact, a written scope and nothing surprising above the ceiling.
There are twelve of us: project leads, a permit coordinator, install and service technicians and our own balancer. The same project lead is on your suite from the walk to turnover.
One project lead from walk to turnover
Our own balancer, so the report isn't a hand-off
Crew members named on the bid
Zakiya Talley
Owner

What clients write
Notes from contractors and tenants
“We moved in on the date we were given. The balance report went into our closeout folder, and the two warm rooms were the first thing they fixed.”
“Their questions about the ceiling came before the equipment was ordered, not after. Two of them changed the layout for the better.”
Sample reviews.
Where we build
Pierce County and the south Sound
Crews start from the shop on Bridgeport Way. If your suite is near a town on the list, ask.

Pierce County
- Lakewood
- Graham
- Eatonville
- Bonney Lake
- Milton
- Edgewood
- Orting
- Buckley
King County
- Auburn
- Kent
Thurston County
- Lacey
- Olympia
- Tumwater
- Yelm
We don't take projects north of Kent, south of Yelm or in Kitsap County. We would rather say so now than run a job we can't visit.
Before you call
Questions from contractors and tenants
Who pulls the mechanical permit?
We do. We prepare the mechanical drawings and file with the city or county building department. The permit fees show as their own line in our bid, so your contractor sees what is ours and what is the jurisdiction's.
What is test and balance?
It is measuring the airflow at every diffuser, grille and exhaust, adjusting until it matches the design, and writing the numbers down. You keep the report with your closeout documents.
Do you bid from drawings, or do you need to see the space?
Both work. A plan set gets you a first scope. A walk lets us check the ceiling space, the existing unit and the roof access before the bid is final.
Can you work around the landlord's rules?
Yes. Roof access, crane days, quiet hours and shaft use are on our checklist before we set dates. Send the lease exhibit with the plans if you have it.
Do you work in a building that is open?
We do. Work near occupied suites is scheduled with the property manager. Noisy work such as coring and hanger drilling is planned for the hours the building allows.
Do you do the electrical for the equipment?
The power connections to the equipment are ours, done by crew members who hold the state's 06A specialty card under our electrical contractor license. Panel work and new circuits are usually your electrician's.
Bid walk
Send the drawings, or ask for a bid walk
Tell us where the project stands. A project lead will call you on the next business day.
- Monday – FridayToday
- 7 a.m. – 4:30 p.m.
- Saturday – SundayToday
- Closed


