Test and balance

Proof the air goes where the drawings say

We measure airflow at every diffuser and grille, adjust until it matches the design, and write the numbers into a report you keep.

The Washington State Energy Code asks for testing and balancing on most commercial systems, and the building department can ask to see the report. We do it ourselves, so the person who built the duct fixes what the numbers show.

What the report holds

  • Airflow at each diffuser, grille and exhaust

  • Fan speeds and damper positions recorded

  • Heating and cooling run and checked against the control sequence

  • A report formatted for your closeout binder

A long corridor of timber-framed glass with insulated pipe and duct running along the ceiling

What drives the scope

What changes a balance visit

More diffusers and more zones mean more time on site.

  • Diffusers and zones

    Each one is measured and adjusted.

  • Ceiling access

    Tile ceilings are quick. Hard lids need access panels.

  • Occupied or empty

    An empty suite is quicker, and we can come in after hours for an occupied one.

  • System type

    Variable-volume boxes and fan-coil units are checked differently.

  • Changes after rough-in

    A layout change late in the job can need a second visit.

  • Who needs the report

    Your contractor, the landlord and the building department may each want a copy.

Questions about balancing

Do I need a test and balance report?

For most commercial mechanical systems the energy code asks for one. Ask your building department what applies to your project.

Do you balance systems you did not install?

Yes. We tell you if what we measure suggests a duct or equipment problem, and quote the repair separately.

When do you balance?

After the ceiling is closed and the equipment has started, and before final inspection and move-in.

Need a report for turnover?

Send the plans and the date your contractor needs it.